Industrial cybersecurity risk assessment

Advanced Shielding for
Critical OT Infrastructure

The definitive standard for protecting industrial plants and power stations against advanced cyber threats, complying with international standards such as ISA/IEC 62443, NERC-CIP, SEC, NIS, NIS2 and MITRE, and in Chile with Law 21.663 (Cybersecurity Framework Law) and Law 21.659

INDUSTRIAL NETWORK VISIBILITY

100% Passive

INTELLIGENT ENGINE

Multi-Standard

[ 01. SYSTEM FOUNDATION ]

What is OTRiskMap?

An advanced risk management and mitigation platform that works like an automated health check-up for critical plants.

01

Continuous Automated Check-up

Works as a continuous clinical diagnosis for factories and power plants, detecting anomalies and latent vulnerabilities without interfering with the control logic of PLCs and RTUs.

$ ot-diagnostics --continuous --mode=passive --depth=deep

02

Integrated Multi-Standard Governance

Automated, real-time cross-referencing of the requirements of Chile's Framework Law 21.663, NERC-CIP and SEC guidelines, simplifying audits and reducing the engineering team's operational workload.

$ compliance-engine --framework=Ley21663+NERC-CIP --status=aligned

[ 02. ZERO IMPACT ENGINEERING ]

Zero Operational Impact Architecture

We make sure industrial cybersecurity never stops production or compromises plant availability.

[METHOD 01]

Passive Visibility (TAPs)

Listens to the industrial network through passive optical TAPs and SPAN ports, without injecting traffic or altering physical operations.

[METHOD 02]

Deterministic Risk Engine

Strict mathematical calculation of gaps and regulatory weighting. Logical, reproducible rules with no false positives, protecting the plant against SEC sanctions.

[METHOD 03]

AI Copilot & Local Obfuscation

Data is anonymized locally first (CIP-011), so AI acts only as an assistant for drafting executive reports, without ever seeing sensitive data.

[ 03. STRATEGIC ROADMAP ]

Conceptual Service and OT Shielding Models

MODEL 01Initial Phase

Caleb: Assessment

Assessment against ISA/IEC 62443, NERC-CIP, NIST, NIS2, MITRE, Chile's Law 21.663, SEC-RIC Technical Specifications and Law 21.719. Review one standard at a time or all of them cross-referenced.

MODEL 02Diagnostic Phase

Bezalel: Discovery

100% passive OT asset inventory: PLCs, HMIs and RTUs with their vendor, firmware, IP address and open ports, including devices nobody had on record (Shadow OT).

MODEL 03Perimeter Phase

Nehemías: Defense in Depth

OT vulnerability analysis: legacy devices, missing patches, unauthenticated protocols and third-party remote access, with defense in depth based on the Purdue model.

MODEL 04Governance Phase

Habacuc: Governance & Alerts

Risk map that cross-references every finding with the applicable standards, with alerts and tracking of legal notification deadlines (3 hours, Law 21.663).

MODEL 05Architecture Phase

Salomón: Master Roadmap

Structured plan from physical upgrades (grounding grids and LSZH cabling) to advanced hardening of engineering workstations.

MODEL 06Resilience Phase

Mateo: Impact Analysis (BIA)

Precise calculation of MTD, RTO and RPO metrics for critical generation and distribution processes.

MODEL 07Total Shielding Phase

José: Resilience & WORM

Offline WORM backups, industrial ransomware drills and final compliance certification.

MODEL 01

Web-Based OT/IT Survey with Multi-Standard Alignment in a Single Assessment.

Caleb: Assessment – “A fearless explorer in the field: scout the real terrain before acting.”

100% WEB PLATFORM

Multi-Site and Multi-Plant Survey

Structured web-based assessment with no invasive agents installed on PLCs or RTUs, centralizing evidence per site to avoid duplicate audits.

  • 100% Web
  • Multi-Site & Multi-Plant
  • No Agents on PLCs/RTUs
  • Centralized Evidence

MULTI-STANDARD ALIGNMENT

ISA/IEC 62443 and Global Frameworks

Maturity assessment of plants and sites using the ISA/IEC 62443 structure of zones, conduits, requirements and security levels, aligned with international standards.

  • ISA/IEC 62443 2-1 / 3-2 / 3-3
  • SL-C vs. SL-T
  • NERC-CIP
  • NIST
  • NIS2
  • MITRE ATT&CK

CHILEAN COMPLIANCE & LAUNCH

Chilean Legal Framework and Timeline

Alignment with Chilean regulations, translating technical gaps into a clear score for the Board and regulators. First version coming soon, in January.

  • Law 21.663
  • Law 21.719
  • CEN
  • SEC-RIC Specifications
  • Coming in January

MODEL 02

Asset Inventory, Visibility and Shadow OT, Legacy Census.

Bezalel: Discovery – “Exodus 31:1-5 / Prov. 27:23 / Eph. 5:13”

PASSIVE CAPTURE (SPAN/TAP)

Critical Protocol Monitoring

Continuous inspection of industrial traffic without affecting plant operations. Full coverage of key protocols and detection of risky legacy services.

  • Modbus TCP (502)
  • DNP3 (20000)
  • Telnet/FTP
  • OPC UA (4840)
  • EtherNet/IP
  • S7comm
  • IEC 60870

AUTOMATED INVENTORY

Complete Asset Profiling

Builds the configuration management database (CMDB) device by device, recording precise attributes of every networked controller and device.

  • MAC Address & OUI
  • IP / VLAN
  • Firmware & OS
  • Siemens
  • Schneider
  • Rockwell

LUKE 15:8 / EPHESIANS 5:13

Shadow OT Visibility & Detection

Bringing to light what operates in the dark: immediate identification of unauthorized cellular modems, hidden serial-to-Ethernet gateways and unattended legacy equipment.

  • Cellular Modems
  • Legacy Equipment
  • Hidden Gateways

MODEL 03

Sources, Detection Method and Prioritization Criteria.

Nehemías: Defense in Depth – “Matthew 9:16-17 / Nehemiah 4:17-18”

THREAT INTELLIGENCE

Correlation with Global and Vendor Databases

Continuous cross-referencing of assets with international catalogs of actively exploited vulnerabilities, industrial alerts and official vendor security advisories.

  • NVD
  • CISA KEV
  • ICS-CERT / CISA
  • CNVD
  • Siemens ProductCERT
  • EtherNet/IP

MATTHEW 9:16-17

100% Passive Fingerprint Analysis

Non-intrusive detection by correlating attributes collected by Bezalel, avoiding active scans that could cause outages in older PLCs.

  • Vendor & Model
  • Open Ports
  • Firmware & OS
  • Zero Invasive Scanning

NEHEMIAH 4:17-18

Composite Scoring and Real Exposure

Comprehensive risk assessment that combines technical severity, exploitation probability and actual location in the Purdue Model, debunking false air-gaps.

  • EPSS Probability
  • Asset Criticality
  • CVSS Severity
  • Purdue Model
  • Compensating Controls

MODEL 04

Zonal Risk Maps and Continuous OT/IT Monitoring with real-time regulated response.

Habacuc: Governance & Alerts – “Habakkuk 2:1 and Ezekiel 33:6-7 — The Watchman: keep constant watch from the tower to warn before the impact.”

100% WEB CONSOLE

Live Zonal Risk Matrix and The Watchman

Combines Bezalel's passive inventory, Caleb's gaps and SOC/NDR/SIEM OT telemetry over ISA/IEC 62443 Zones and Conduits to generate real heat maps by plant, substation and Purdue cell.

  • ISA/IEC 62443-3-2
  • FR 5 & FR 6
  • NDR / SIEM OT
  • MITRE ATT&CK ICS
  • Coming in March

LEGAL TRACEABILITY & ESCALATION

Guided Response and Regulatory Deadlines

Assigns owners, SLAs and a log for the Cybersecurity Delegate, automating timed packages to meet notification deadlines before the ANCI, the CEN and the NIS2 Directive.

  • Law 21.663 ≤3h / 72h
  • NIS2 24h/72h/1m
  • CEN / NERC CIP
  • Law 21.719
  • SEC-RIC

FRICTIONLESS CONTAINMENT

DMZ 3.5 Isolation and the OTRiskMap Ecosystem

Triggers rapid IT-OT isolation with Store & Forward backup without stopping operations or injecting active traffic, connecting Bezalel and Caleb with Nehemías, Salomón and Mateo BIA.

  • DMZ 3.5 Panic Button
  • Zero Invasive Traffic
  • Store & Forward
  • Complete Suite

MODEL 05

Technology Risk Treatment Plan in Phases, from 0 to 24 Months.

Salomón: Master Roadmap – “1 Chronicles 28:11-12 / Nehemiah 3:1 / Habakkuk 2:1 / Genesis 41:35-36”

PHYSICAL FOUNDATIONS & PERIMETER

Electrical Works, Segmentation and Access Control

Builds the physical and electrical foundation under SEC-RIC regulations in the first 6 months, followed by Purdue topology deployment, network redundancy and a secure access bastion between months 6 and 12.

  • SEC-RIC Physical/Electrical Foundations
  • DMZ 3.5 & PAM
  • PRP/HSR

FIELD & PASSIVE MONITORING

Field Hardening and Anomaly Detection

Hardening of controllers and field devices, along with passive traffic capture, industrial network detection and centralized event correlation between months 12 and 18.

  • Field Hardening
  • Passive TAPs
  • Industrial NDR
  • OT SIEM

RESILIENCE & CONTINUITY

Immutable Backups, Black Start and Response

Consolidation of offline, immutable storage, recovery procedures for a total collapse and operational workflows for timely notification.

  • WORM Air-Gap Backups
  • Black Start
  • 3h ANCI Playbooks

MODEL 06

Downtime Impact, Recovery Times and Restoration Priority.

Mateo: Impact Analysis (BIA) – “Luke 14:28-30 / Exodus 10:7 / 1 Corinthians 12:21-22”

CRITICAL TIMES & 5 LEVELS

MTD, RTO, RPO and WRT Calculation

Defines tolerance and impact thresholds assessed on 5 severity levels across physical safety, operational continuity, regulatory fines and estimated financial loss.

  • ANCI Fines 40,000 UTM / SEC 10,000 UTA
  • Safety & Continuity
  • WRT
  • RPO
  • MTD
  • RTO

PROCESS MASTER MATRIX

Process Coverage BIA-01 to BIA-05

Worst-case impact assessment for key industrial and electrical processes, cross-referencing supporting assets, vital dependencies, legal framework and restoration priority.

  • BIA-01 Teleprotection/EDAC
  • BIA-02 SCADA/RTU
  • BIA-03 CEN/ICCP Dispatch
  • BIA-04 PAM Remote Access
  • BIA-05 Plant Historian

1 CORINTHIANS 12:21-22

Interdependencies and Restoration Order

Identifies each process's vital dependencies, such as grounding grids, UPS, links and firewalls, and sets the recovery order from Priority 1 (immediate) to 5, so what cannot fail comes back first.

  • Vital Interdependencies
  • Priority 1 to 5
  • UPS & Batteries
  • Law 21.663 / NERC-CIP

MODEL 07

Immutable Backups and Clean Recovery for Your OT Plant.

José: Resilience & WORM – “Genesis 41:35 — Strategic provision in times of stability to ensure continuity in a crisis.”

WORM VAULTS & AIR-GAP

Backups Immune to Encryption or Deletion

Links each of Bezalel's critical assets to its Gold Image and safeguards PLC logic, SCADA/HMI projects and IED/RTU configurations under a Write Once Read Many policy with cryptographic hash verification.

  • Immutable WORM
  • Logical/Physical Air-Gap
  • Hash Verification
  • PLC / SCADA / IED Logic

DRP & OPERATIONAL CONTINUITY

Measured Drills and Black Start

Runs and audits recovery tests in an isolated environment, measuring real RTO, RPO and WRT, along with step-by-step Black Start playbooks and electrical room recovery.

  • RTO / RPO / WRT Tests
  • Clean Recovery
  • Black Start Playbooks
  • Electrical Rooms

STANDARDS & OTRISKMAP ECOSYSTEM

Chilean Law, Global Standards and Integration

Certifies resilience and continuity under international standards and Chilean regulations, connecting Bezalel's inventory, Habacuc's alerts, Salomón's phase and Mateo's BIA thresholds.

  • ISA/IEC 62443 FR 7 / 2-1
  • NERC CIP-009 / 010
  • NIST RC / SP 800-82r3
  • NIS2 Art. 21.2.c
  • Law 21.663 / 21.719
  • CEN & SEC-RIC

[ 04. LEGAL COMPLIANCE ]

Regulatory Frameworks and Legal Integration

Automated regulatory cross-referencing for vital operators of critical infrastructure.

STANDARD / REGULATION JURISDICTION / SECTOR MANDATORY CRITICAL REQUIREMENT
Cybersecurity Framework Law 21.663 Chile (Operators of Vital Importance, OIV) Early incident notification within ≤ 3 hours. Learn more about the law →
NERC-CIP Standards Power Sector / Generation CIP-002 to CIP-014 (control perimeters and baseline management).
SEC-RIC Technical Specifications Chile (Electrical Installations) RIC 06 (grounding grids), RIC 04 (LSZH), RIC 02 (control panels).
ISA / IEC 62443 & NIST CSF 2.0 Global Industrial / NIS2 (EU) Zones, Conduits, Security Levels (SL 1-4) and C-Level governance.

Ready to audit your critical infrastructure with zero operational risk?

Book a specialized technical demo with our engineers, designed for Operators of Vital Importance (OIV) and industrial plants.

Contact us

Request received!

Thank you for contacting us.
A specialist will review your message and get back to you shortly.